CHALLENGER UMM AL AFAII LABOR CAMP

CHALLENGER UMM AL AFAII LABOR CAMP

COUNTRY: QATAR

TOTAL VALUE: QAR 29.5 MILLION

CLIENT: CHALLENGER TRADING & CONTRACTING

MAIN CONTRACTOR: WATERMASTER (QATAR)

PERIOD OF REALIZATION: 2017

SIZE:

RO SYSTEM 2,000 M3/ DAY & STP SYSTEM 1,600 M3/ DAY



 CHALLENGER UMM AL AFAII LABOR CAMP

THE CONCEPT

Supply, Installation and Maintenance on turnkey basis of Reverse Osmosis and Sewage Treatment Plants; including Pumping Stations, Water Networks, Control Panel, Wiring and Connections, storage tanks and connection valves, with a nominal capacity of an RO system of 2,000m3/day and STP system of 1,600 m3/day suitable for accommodating 10,000 inhabitants.

Due to the successful use of projection software and full-scale tests including the evaluation of the flux level as well as the permeate flow, a new design was suggested for the RO system. Proper preventive action helped to improve the water quality, increase pressure and most importantly, extend the longevity of the membranes.