Design & build project for containerized Reverse Osmosis and Sewage Treatment systems suitable for accommodating 4,000 inhabitants. A properly designed solution helped to meet the specific needs of the client so that the camp inhabitants can live in top-quality conditions. This was achieved by ensuring sufficient water pressure and pristine quality, while keeping costs front of mind at the same time.
AMLAAK LABOR CAMP
COUNTRY: QATAR
TOTAL VALUE: QAR 1.5 MILLION
CLIENT: Q-AMLAAK-M
MAIN CONTRACTOR: WATERMASTER (QATAR)
PERIOD OF REALIZATION: 2015-2017
SIZE:
TOTAL VALUE: QAR 1.5 MILLION
CLIENT: Q-AMLAAK-M
MAIN CONTRACTOR: WATERMASTER (QATAR)
PERIOD OF REALIZATION: 2015-2017
SIZE:


